Engineering Analysis: Dynegy
Site: Danskammar Power Plant
Site Location: Newburgh, NY
Site Description: Power Generation Facility
Project Overview: Engineering study, repairs and inspections.
“Associated Fire Protection does high quality sprinkler and alarms system work for me. They coordinate well with me to schedule the work, and I’ve not had any problems.”
– Dana Ferber (Plant Manager)
Engineering Phase:
Provide a comprehensive description of the fire hazard and a description of all existing fire protection equipment. Test and report the status of all fire protection systems, including:
- Diesel fire pump
- Alarm systems
- Hydrants
- Hose stations
- Mainline fire strainers
- Wet pipe sprinkler system
- Carbon dioxide systems
- Halon 1301 system
- Portable fire protection (dry chem, CO2, foam)
Repair and Upgrade Phase:
AFP technicians performed all appropriate work on the fire protection systems and components listed above restoring them to NFPA standards and local fire official requirements.